Outage centre

Report a power cut and follow the repair with one reference number.

No account needed. Check the planned list first — if your area is on it, power returns at the stated time and no report is needed.

905
Free hotline, 24/7
No account
Needed to report
48 hrs
Notice for planned work

A fallen or sparking wire, smoke or a burning smell is a danger to life. Call 905 now and keep everyone 10 metres away.

Check before you report

No sign-in

Enter your meter number or area to see if planned work or a known fault already covers your address.

Right now

  • COTOBIE · EAAR Project Office Rehabilitation Work · restoring 08:00 – 16:30
  • ADDIS CENTER · WAAR Rehabilitation · restoring 08:00 – 16:00
  • Bahir Dar-II · BahirDar Preventive Maintenance · restoring 10:00 – 17:30
  • Bahir Dar-II · BahirDar New Connection · restoring 10:00 – 12:00
  • SULULTA · SHEGER New Connection · restoring 11:00 – 13:00
  • SEBETA-I · SHEGER New Connection · restoring 11:00 – 13:00
  • BahirDar Mobile Substation · BahirDar New Connection · restoring 14:00 – 15:00
  • Hawassa No. 1 · Sidama New Connection · restoring 15:50 – 16:50
  • Hawassa No. 1 · Sidama New Connection · restoring 15:50 – 16:50
  • Hawassa No. 2 · Sidama Preventive Maintenance · restoring 17:30 – 20:18
  • Hawassa No. 1 · Sidama Preventive Maintenance · restoring 17:31 – 20:25
  • Everywhere else no interruptions reported
Hotline 905 · free, 24/7SMS 8869

What are you seeing?

Pick the closest match — it sets the priority and the crew.

Report an outage

Public report

A reference number is sent by SMS as soon as you submit. Quote it on any call to 905.

+251

Photos — optional, safe distance only

or browse files

Up to 5 images · 0 / 5 uploaded

* Required. Your number is used only to send the reference and restoration updates.

Do not use this form for danger

Live wires, sparking equipment, smoke, a fire near a pole, or anyone injured — call 905 immediately. Forms are queued; the hotline is answered in seconds.

What happens next

  1. 1Reference by SMSSent within a minute. It is how 905 finds your report without you repeating the details.
  2. 2Matched and prioritisedReports from the same feeder are grouped so a crew is sent to the cause, not to each caller.
  3. 3Crew dispatchedEmergencies go out immediately. Other faults are scheduled by district and by how many premises are dark.
  4. 4Restoration confirmedA closing SMS tells you what the fault was. If your power is still off, reply to it and the report reopens.

Already reported?

Track a report with the reference number from your SMS.

Track my report

Planned outages

Scheduled work that will interrupt supply. All times local (EAT).

  • UpcomingK2_Debre_Berhan_15KV

    DebreBirhan · Debre_Birhan_2

    Debrebrehan City(Kebele04,05,06,07,08) ,Etal aluminium,ethiolongitude,Getyemamo factory,Biniyam Selemon factory and debreholland ,Goshebado and chimbere

    MV, DTr. Relocation

    Dec 18, 202614:00 – 17:00
  • UpcomingADG-3

    NAAR · ADDISU GEBEYA

    Around Kechene Hisanat Masadegiya; Wetat Mehakel; Wereda 4

    New Connection

    Dec 7, 202609:00 – 12:00
  • UpcomingJinka L2

    ArbaMinch · Key Afer

    JINKA,DEBUBU ARI AND MALE WERDA

    Preventive Maintenance

    Oct 9, 202608:30 – 17:00
  • UpcomingLEG-13

    EAAR · LEGETAFO

    Around abado medhaniyalem and st.gebriel church

    Project Office Rehabilitation Work

    Oct 8, 202608:00 – 16:30
  • UpcomingJinka L2

    ArbaMinch · Key Afer

    JINKA AND DEBUB ARI

    Preventive Maintenance

    Oct 8, 202608:30 – 17:00
  • UpcomingAmbesamie

    BahirDar · BahirDar Mobile Substation

    Ambesame

    New Connection

    Oct 8, 202610:00 – 11:00
  • UpcomingJinka L2

    ArbaMinch · Key Afer

    JINKA,DEBU ARI WOREDA,MALE WOREDA,BAKA DAWULA WEREDA

    Preventive Maintenance

    Oct 7, 202608:30 – 17:00
  • UpcomingLEG-2

    SHEGER · LEGETAFO

    Legetafo Town Partially, Legedadi,44 Mezoria and Dire Sekoru

    Preventive Maintenance

    Oct 7, 202608:30 – 16:30
  • UpcomingGEF-21

    SHEGER · GEFERSA

    Burayu Town Partially, Kela and Chesheir

    Preventive Maintenance

    Oct 7, 202608:30 – 16:30
  • UpcomingAir_Force_15kV

    BahirDar · Bahir Dar-II

    B/Dar Town Mekod, Yibab Campus,Tikur Wuha,Air port and Air Force.

    Preventive Maintenance

    Oct 7, 202609:00 – 17:30
  • UpcomingMeder genet_15kv

    BahirDar · BahirDar Mobile Substation

    B/Dar Abay Mado Diaspora,Arsema and Medere Genet Villages

    New Connection

    Oct 7, 202609:00 – 12:00
  • UpcomingCOT-1

    EAAR · COTOBIE

    Around kara gebissa and mesalemiya gebriel

    Project Office Rehabilitation Work

    Oct 6, 202608:00 – 16:30
  • UpcomingADC-4

    WAAR · ADDIS CENTER

    mezgebe sega bet to welo sefer behind INSA

    Rehabilitation

    Oct 6, 202608:00 – 16:00
  • UpcomingAbay 15kV

    BahirDar · Bahir Dar-II

    B/Dar Kebele 08,selam Campus, Peda University, Wisdom Tower, Papyrus Hotel

    Preventive Maintenance

    Oct 6, 202610:00 – 17:30
  • UpcomingGhion_15kV

    BahirDar · Bahir Dar-II

    B/Dar Kebele 15 Safari Mole by The region Construction team.

    New Connection

    Oct 6, 202610:00 – 12:00
  • UpcomingSUL-4

    SHEGER · SULULTA

    Sululta Town Around Mizan

    New Connection

    Oct 6, 202611:00 – 13:00
  • UpcomingSEB-11

    SHEGER · SEBETA-I

    Furi Town Partially

    New Connection

    Oct 6, 202611:00 – 13:00
  • UpcomingTana_15kv

    BahirDar · BahirDar Mobile Substation

    B/Dar Abay Mado Adis Alem and Cherechera Villages

    New Connection

    Oct 6, 202614:00 – 15:00
  • UpcomingFEEDER-10

    Sidama · Hawassa No. 1

    INDUSTRI

    New Connection

    Oct 6, 202615:50 – 16:50
  • UpcomingF 8 / R 7

    Sidama · Hawassa No. 1

    INDUSTRI ZONE

    New Connection

    Oct 6, 202615:50 – 16:50
  • UpcomingF 1 / R 6

    Sidama · Hawassa No. 2

    Alation,atote,106 wefchosefer,corem

    Preventive Maintenance

    Oct 6, 202617:30 – 20:18
  • UpcomingFEEDER-7

    Sidama · Hawassa No. 1

    factory

    Preventive Maintenance

    Oct 6, 202617:31 – 20:25

Last updated . Schedules can change if weather or equipment delays the crew. For a specific address, call 905.

One reference, start to finish

The number in your first SMS carries through dispatch, repair and closure, so nothing has to be explained twice.

905 is free from any network

Answered 24 hours a day in Amharic, Afaan Oromo, Tigrinya and English. Use it for anything dangerous.

Treat every wire as live

Never move a fallen conductor, never touch a pole after a storm, and keep children and livestock away until a crew arrives.

Common questions

Only my house is dark. Is that an outage?
Usually not. Check your main breaker and, on a prepaid meter, your remaining balance. If the street has power and yours does not, file it as a meter fault.
Do I need an account to report?
No. Reporting is open to anyone with a phone number, because a dangerous fault must never wait for a login.
Why has nobody come yet?
Crews are sent to the cause of a fault, not to each report. A single failed transformer can restore hundreds of premises at once, so it is worked first.
How do I know a technician is genuine?
Every EEU technician carries a photo ID with a badge number. Call 905 and read out the number before letting anyone work, and never pay cash at the door.
Can I get the schedule for my area?
Yes. Planned work is published here and sent by SMS 48 hours ahead to customers whose meter is linked to a phone number.
What if the power comes back then goes again?
Report it and say it comes and goes. Repeat interruptions point to a different fault — often vegetation or a loose joint.

Still stuck? Call 905 free, 24/7, or contact customer care.

Get told before the power goes off

An account links your meter to your phone, so planned outages arrive by SMS 48 hours ahead and restoration updates come without you asking.